SPECIFICATIONS / OPERATING COST ANALYSIS

Shift Operating Cost Comparison

Compare two lighting plans for the same lighting task. Enter your site assumptions; this tool does not use a default D955 fuel rate, price, or savings claim.

Shared shift assumptions 01

Refuelling events below are total events for the selected fleet. Maintenance budgets are total shift budgets for that fleet.

Plan A 02

Plan B 03

Plan A shift total (USD)

—

Plan B shift total (USD)

—

Difference (USD)

—