Get in touch with LFADJ Company
Shift Coverage and Recharge Roster
Estimate whole-unit rotation for repeated continuous duty using your validated operating time. Values shown are planning examples, not a guaranteed LF6128 runtime.
Enter the project values and select Calculate.
Assumptions and scope
- Enter hours as plain decimal numbers with at most two decimal places.
- Each batch operates for the full usable runtime while previous batches recover.
- Total batches = 1 + rounded-up (recovery time ÷ runtime); recovery = charging + preparation.
- Assumes sufficient chargers, identical units and timely handovers. Add any safety reserve separately.
- This is a steady-state rotation estimate, not the minimum for a short one-off job or a battery hot-swap plan.



