Shift Timing Planner for Portable Construction Lights

Enter the actual usable lighting and charging times available for one unit. This is a scheduling-time screen only; it does not prove stored energy, site power availability, or multi-shift continuity.

Reference entry

LF6128 uses 8 h / 6 h as a conservative table reference here, not a field measurement.

Timing screen

Enter values from 0 to 168 hours, then check the gaps.

Discuss a project configuration