Get in touch with LFADJ Company
Deployment Time Budget
Compare the labor time of two complete setup procedures. Include positioning, stabilizers, raising, aiming, checks, lowering and securing.
- Labor-minutes = procedure minutes × crew size × deployments.
- A negative difference means the proposed procedure uses more labor time.
- The prefilled numbers are an illustrative planning scenario.
Enter measured procedure times, then compare.
How to Use the Results
- Time the complete procedure with the same site and crew conditions.
- Enter both measured durations and crew requirements.
- Compare the labor difference with equipment, training, service and transport costs.
The calculation does not establish LFADJ lift speed, a minimum crew, a safe operating method or guaranteed savings. Use the selected tower’s operating instructions and trained personnel.
Discuss Your Deployment Requirements



