LFADJ Industrial Mobile Lighting

Diesel Light Tower for Industrial Projects

Specify a diesel light tower around your work area, night shift and transport route. LFADJ supplies mobile lighting configurations for outdoor construction, equipment maintenance and emergency operations, with mast, LED light and generator requirements agreed for your project.

  • Manual winch, hydraulic and pneumatic mast configurations
  • D955: four 400 W LED lights with a 7 m hydraulic mast
  • Project quotations based on configuration, quantity and destination
D955 Diesel Light Tower with 7m hydraulic mast and LED lights
LED lights 4 × 400 W
Hydraulic mast 7 m
Mast rotation 340°
Delivery lead time 45–60 days
SYSTEM SPECIFICATIONS

Diesel Light Tower Configurations

Repeated moves, uneven access and long shifts place different demands on a portable diesel light tower. We offer three mast configurations so your team can choose the lifting arrangement alongside the lighting and power package.

D951 Manual Winch Mast Configuration

01 D951: Manual Winch

Our D951 range uses a manual winch mast. Include the frequency of relocation and the crew’s lifting procedure in your brief, so the proposed setup works for regular handling.

D955 Hydraulic Lift Mast with 4 LED floodlights

02 D955: Hydraulic Lift

Our D955 configuration features a 7 m hydraulic mast with four LED floodlights. It gives buyers a defined starting point for checking deployed space, lamp arrangement and transport dimensions.

D957 Pneumatic Telescopic Mast Configuration

03 D957: Pneumatic Mast

Our D957 range uses a pneumatic telescopic mast. Discuss the air supply, controls and setup procedure for the proposed equipment configuration.

LED Lighting for Your Work Area

A bright lamp specification will not tell you how evenly a light tower will illuminate a work area. Lumen output, the distribution of the lamp beam, aiming and obstructions will influence the useful light reaching the work; total wattage of a lamp fixture is not a substitute for lighting planning.

Site-to-Configuration Matrix

Site constraint
What it changes
Include in your quotation brief
Detailed work beside a wider access area
One average reading can conceal a poorly lit task
Work zones, task descriptions and the required illuminance at each zone
Structures, stockpiles or parked equipment
Shadows can require a different tower position or another unit
A marked site sketch, obstruction heights and proposed tower positions
Adjacent traffic or occupied premises
Bright lights can create glare in adjacent travel lanes
Traffic directions, nearby windows and limits on spill light
Long shifts with limited fuel access
Fuel access can interrupt a night shift
Operating hours, expected generator load and refueling windows
Sockets serving additional equipment
Auxiliary tools compete with lighting for generator capacity
Running watts, starting demand and simultaneous loads
Noise-sensitive boundary
Generator noise can prevent use near sensitive areas
Required noise limit, measurement distance and operating load
Restricted delivery or setup space
Transport and operating dimensions are not interchangeable
Access width, height restrictions and usable ground footprint

Diesel Generator and Towable Trailer Configuration

A diesel generator light tower must supply its lamps and any agreed auxiliary equipment. Starting demand can exceed running demand, so matching only the steady load can leave too little capacity when another motor starts.

Engine, Output and Connections

  • Specify generator duty, rated kW or kVA, voltage, phase and frequency.
  • List every auxiliary load, its starting demand and the intended starting sequence.
  • State the required socket type, outlet protection and cable arrangement.
  • If your fleet has a preference for a particular engine manufacturer, e.g. Kubota, include it in your request.

Towable Trailer and Site Access

  • Give the delivery route, towing interface and handling equipment available on arrival.
  • Consider the stowed and deployed dimensions of equipment in relation to the work zone and access constraints.
  • Specify road-use requirements separately from movement inside the jobsite.
  • Include the destination’s engine and import documentation requirements.
Diesel Generator and Towable Trailer Access Configuration
View Access Specs

Match documents to the ordered engine

For US-bound shipments, EPA identifies Form 3520-21 for importing nonroad engines, including engines installed in equipment. The required evidence must match the supplied engine and intended use; a general lighting brochure will not establish eligibility for import.

D955 Diesel Light Tower Specifications

LFADJ’s D955 hydraulic configuration has four LED lights rated at 400 W each and a mast rotation of 340 degrees. Access problems occur because the deployed supports need more space than the stowed trailer. Use the following dimensions to compare delivery access and the space required after deployment.

D955: 7 m hydraulic mast configuration

LFADJ Industrial Mobile Lighting Watermark
Item Configuration Purchasing implication
Model D955 Identify this configuration in the quotation
Lighting Four LED floodlights Check beam arrangement for the task
Lamp power 400 W per lamp 1,600 W combined lamp input; generator capacity is a separate specification
Mast 7 m hydraulic mast Plan the lifting position and overhead space
Mast rotation 340° Position the trailer with the required aiming direction in mind
Transport dimensions 1650 × 1450 × 2350 mm Length × width × height in transport configuration
Operating dimensions 2650 × 2450 × 7200 mm Length × width × overall height when deployed
Container loading 4 units / 20 ft; 8 units / 40 ft For this configuration; finalize the packing arrangement with the order
Delivery lead time 45–60 days Agree the schedule and freight arrangements in the quotation

Diesel Light Tower Price and Lead Time

Keep in mind the purchase price does not include fuel or maintenance. Attractive unit prices may cover different engines or mast or trailer packages. Compare bids for the same lighting, operating hours and scope of delivery before awarding the contract.

Build a comparable quotation

Cost item Information to align
Equipment Lamps, mast, engine, generator, controls and trailer
Delivery Quantity, packing, destination and included freight scope
Operation Load-specific fuel consumption, fuel price and annual operating hours
Maintenance Engine manual, planned service items and local support arrangements
Commercial terms Payment schedule, warranty scope and delivery milestones in the offer
Diesel Light Tower Price, Operating Cost and Lead Time Comparison

Compare the Costs Your Site Will Actually Incur

Our quotation comparison tool allows you to add equipment and freight costs, in addition to fuel and service costs, for the period you select. This gives you the opportunity to evaluate the trade-off between a lower purchase price and a higher operating cost, without taking a position on whether or not the quote represents better lighting.

  • Use the same currency and annual hours for both quotes.
  • Enter consumption at comparable loads.
  • Review excluded costs, including downtime and financing, separately to avoid a gap between the modeled cost and your project budget.

D955 Delivery Planning

We offer the D955 configuration with a delivery lead time of 45–60 days. The quotation sets out the schedule and transport arrangements for your quantity and destination.

Quality Assurance and Project Documentation

LFADJ is a trademark of Zhejiang LONGFA Lighting Co., Ltd., established in Yueqing, Zhejiang, in 2013. We provide product selection and lighting configuration support for industrial production, maintenance, night construction and emergency work.

  • Configuration agreement: Identify the model, mast, lighting, engine and electrical interfaces in the technical offer.
  • Project documents: specify drawings, product test documents and destination-related paperwork needed for acceptance.
  • Service agreement: define warranty coverage, maintenance responsibilities and support arrangements in the contract.

Match the light to the task, then match the generator, mast, and transport arrangement to the site.

Operating Requirements Belong in the Brief

Give your team the instructions for setting up, fueling, and maintaining the ordered equipment. In accordance with OSHA’s portable-generator guidance, generators should be operated outdoors, with appropriate electrical connections, and shut down and cooled before fueling.

“Before refueling, shut down the generator and allow it to cool.”

— OSHA, Using Portable Generators Safely
Enlarged View Enlarged View Enlarged View Enlarged View Enlarged View Enlarged View

Ordering: From Site Brief to Delivery

Based on your application environment and your lighting requirements, we will discuss a mobile light tower configuration.

  1. Describe the site: send the work area, tasks, lighting targets and operating schedule.

  2. Select the package: discuss mast operation, lamps, generator output, outlets, and trailer.

  3. Align the offer: agree quantity, destination, documents, commercial terms and delivery arrangements.

  4. Prepare for use: coordinate receipt, operating information and after-sales contact under the contract.

Ordering Mobile Light Tower Configuration from Site Brief to Delivery

Plan Your Night Shift

Estimate run time from the usable fuel, a retained reserve, and expected consumption at the intended load. Fuel tank size alone does not establish how many shifts a portable light tower can complete.

Mobile Lighting Project Experience and Case Studies

Discuss a Similar Configuration
Indonesia Eight Mobile Lighting Towers Project Case Study 2023

Indonesia: Eight Mobile Lighting Towers, 2023

We supplied eight mobile lighting towers for an Indonesia project in 2023, configured with four 1000 W LED lights and a 9 m manual mast. This project configuration is separate from the D955 hydraulic specification shown above.

  • Quantity: eight towers
  • Light arrangement: 4 × 1000 W LED per tower
  • Mast: 9 m, manual operation

Night Construction

Use task locations and traffic routes to plan where lighting equipment can stand without obstructing work or creating glare.

Industrial Maintenance

Include equipment shadows, work height and auxiliary power needs so the proposed light and power package fits the maintenance task.

Emergency Operations

Define access, expected operating hours, and fuel logistics, prior to selecting a mobile lighting arrangement for temporary outdoor work.

Diesel, Solar and Grid-Powered Lighting

The most practical power source depends on location and how the equipment is replenished. Diesel provides independence from a mains power source; electrical supply, battery charging and solar power recharge call for different operating plans.

Choose by operating constraint

Option Suitable brief Constraint to resolve
Diesel Outdoor remote work with planned fuel access Exhaust, refueling, engine service and site noise
Grid-powered Work with a suitable, dependable electrical supply Available circuit capacity and safe cable routing
Battery or solar Work where local exhaust or engine noise is undesirable Required output, stored energy and a dependable charging or recharge plan
Hybrid A duty cycle that can benefit from alternating power sources Battery capacity, control strategy and the actual engine-running schedule
Diesel, Solar and Grid-Powered Mobile Lighting Comparison

Enclosed Work Needs Another Approach

Choose an electric or battery lighting arrangement suitable for indoor or enclosed work. OSHA states portable generators must not run indoors or in enclosed spaces, and outdoor exhaust must be kept from entering occupied spaces.

PROCESS // PROJECT QUOTATION BRIEF

Request Your Diesel Light Tower Quote

Send LFADJ your site layout, quantity, and destination to start configuration and pricing discussions. Include your shift length, mast preference and electrical requirements to help tailor the offer to the use case of the tower.

Request a Project Quote
  • Work area and lighting target
  • Operating hours and fuel access
  • Quantity, destination and delivery needs

SPECIFICATIONS // TECHNICAL Q&A

FAQ: Diesel Light Tower Questions

Send the dimensions of the work area, the lighting task, the duration and frequency of the shifts, the number and destination. Include the mast preference, any additional electrical loads, access to the site, and the project documents, as applicable.

Coverage will depend upon the desired illuminance, distribution of the beam, positioning of mast and obstructions. Provide us with a lighting target and site plan to help us understand the actual task.

Estimate operating hours from usable fuel after reserve divided by consumption at the intended load. For a planning example only, 60 L available after reserve at 2 L/h gives 30 hours; those inputs are illustrative, not D955 specifications. Use the shift planner with the fuel allowance and load-specific consumption supplied for your configuration, then check whether refueling fits your shift schedule.

This is dependent upon the agreed capacity of the generator and the outlet configuration. List the running demand of all loads and motor starting demand, and indicate which loads will be operated simultaneously.

This is dependent on the local jurisdiction and the task being performed. In the US, OSHA 1926.56 lists 5 foot-candles for general construction area lighting, with different values for other listed activities; use the category that applies to your work. 1

Compare values taken under the same load and measurement conditions, including the measurement distance from the equipment. Give us your limit and indicate the schedule during which lighting will be operated so we can determine noise level requirements.

No. The 2023 project used four 1000 W LED lights and a 9 m manual mast, while the D955 configuration here uses four 400 W lights and a 7 m hydraulic mast.

Compare expected equipment utilization, rental costs, transport, fuel and maintenance. Determine if you have the capacity to support the equipment. A short project duration and regular fleet utilization may influence the buying decision differently.

Warranty, maintenance and support are agreed to in the contract for your order.