Shift Coverage and Recharge Roster

Estimate whole-unit rotation for repeated continuous duty using your validated operating time. Values shown are planning examples, not a guaranteed LF6128 runtime.

Enter the project values and select Calculate.

Assumptions and scope

  • Enter hours as plain decimal numbers with at most two decimal places.
  • Each batch operates for the full usable runtime while previous batches recover.
  • Total batches = 1 + rounded-up (recovery time ÷ runtime); recovery = charging + preparation.
  • Assumes sufficient chargers, identical units and timely handovers. Add any safety reserve separately.
  • This is a steady-state rotation estimate, not the minimum for a short one-off job or a battery hot-swap plan.