Get in touch with LFADJ Company
Work Light Energy and Handling Cost Planner
Estimate two operating-cost components using your own measurements and rates. All amounts use the currency you enter in your project records; the tool does not convert currencies.
How to use the result
- Electricity use = measured input power × hours per day × days. Electricity cost = use × local tariff.
- Handling time = moves per day × minutes per move × days ÷ 60. Handling cost = time × hourly labour cost.
- Enter charger input measurements when assessing rechargeable units; lamp wattage alone does not include charging losses.
- This subtotal excludes purchase, fuel, maintenance, freight, taxes and downtime. It is not a total cost of ownership or a savings claim.
- For generator systems, assess fuel costs separately with measured fuel consumption.