Deployment Time Budget | LFADJ

Deployment Time Budget

Compare the labor time of two complete setup procedures. Include positioning, stabilizers, raising, aiming, checks, lowering and securing.

  • Labor-minutes = procedure minutes × crew size × deployments.
  • A negative difference means the proposed procedure uses more labor time.
  • The prefilled numbers are an illustrative planning scenario.
Enter measured procedure times, then compare.

How to Use the Results

  1. Time the complete procedure with the same site and crew conditions.
  2. Enter both measured durations and crew requirements.
  3. Compare the labor difference with equipment, training, service and transport costs.

The calculation does not establish LFADJ lift speed, a minimum crew, a safe operating method or guaranteed savings. Use the selected tower’s operating instructions and trained personnel.

Discuss Your Deployment Requirements